
praise the lord!
Friday, May 28th, 2004
The I95 project near the mixing bowl in Springfield is moving along great. Previously Southbound 395 dumped into the left hand lane of 95S. 495-outer-loop dumped into the right hand lane of 95S and 495-inner-loop dumped into the center. These three form I95 south.
On this Memorial Day weekend (which I recall as wasting about two hours of my time last summer) things are much better. 495-inner-loop (the primary 95 south road) dumps about a mile down from the other two, and on the left hand side. Most 95 south drivers want to get into the HOV lanes and that is a left-exit as well.
I got home in 30 minutes — that’s the same as any other day.. and I even left in more rush hour (5:30 instead of 6:30 like normal). I am a happy p0ny.
The I95 project near the mixing bowl in Springfield is moving along great. Previously Southbound 395 dumped into the left hand lane of 95S. 495-outer-loop dumped into the right hand lane of 95S and 495-inner-loop dumped into the center. These three form I95 south.
On this Memorial Day weekend (which I recall as wasting about two hours of my time last summer) things are much better. 495-inner-loop (the primary 95 south road) dumps about a mile down from the other two, and on the left hand side. Most 95 south drivers want to get into the HOV lanes and that is a left-exit as well.
I got home in 30 minutes — that’s the same as any other day.. and I even left in more rush hour (5:30 instead of 6:30 like normal). I am a happy p0ny.
